TESTING AND TRIALLING FACILITIES

Instytut Kolejnictwa

IK Żmigród

RTS PRIORITY AREAS1

Capability Statement

7.725km long test track with top speeds of 120-140kmh, including station with laboratory, training building and signal tower. Approximately 3km from the Żmigród station.

Capability – Systems

Railway vehicles; components; track; traffic control; traction equipment

Capability – Testing

Crash tests; EMC; inverted curves; noise; vibration.

Location key contacts

Name: General enquiries
Email: oetd@ikolej.pl

Website

FIND OUT ABOUT

ACADEMIC CAPABILITES

Capabilities