TESTING AND TRIALLING FACILITIES

Administrador de Infraestructuras Ferroviarias (ADIF)

ERTMS lab

RTS PRIORITY AREAS1

Capability Statement

Analysis and advanced data management laboratory based on a Client-Server system, that will control the GSM-R and ETCS N2 communications, by synchronizing messages: – GSMR-R: A, Abis, Gb, MAP (SS7) – ETCS – IXL (Interlocking)

Capability – Systems

GSM-R networks; interfaces

Capability – Testing

ERTMS Level 2 messages analysis and post processing obtained by continuous system monitoring.ralized GSM-R/ETCS control of high speed and conventional network equipped with ERTMS.

Location key contacts

Name: General enquiries
Email: innova@adif.es

Website

FIND OUT ABOUT

ACADEMIC CAPABILITES

Capabilities