Our 12 mile standard gauge route in the Irwell Valley offers a wide variety of track forms and line topography that provide a challenging environment for the proving of equipment such as track tamping plant, ballast cleaning and regulating equipment, rail grinding machines and also track recording and data acquisition apparatus. A section of our infrastructure is also approved for 100km/h operation for the testing and proving of track machines and other rolling stock. We are linked to the main line network providing easy access for rail borne vehicles thereby avoiding the need for inefficient and costly road transportation.

Capability – Systems

On track plant; permanent way; propulsion system; brakes; coupling systems; information systems; signalling systems; telecommunications.

Capability – Testing

Dynamic test; Crash test; Light system test; Acoustic test; Fire safety test; Weighting test; Aerodynamics test; Commissioning; Proving.

Location key contacts

Name: General enquiries
Email: enquiries@eastlancsrailway.co.uk

Website

FIND OUT ABOUT

ACADEMIC CAPABILITES

Capabilities